Results
• $21,000 to $30,000 saved based on the fact that the three vendors had already worked together.
• “Lights out Automation” — 19 hours of shift labor per day was reduced to 9 hours per day for a labor/cost savings of $98,147.
• Billing is now done within 24 hours and the accounting department labor was reduced by 27.25% for a savings of $48,848.
• Automated job costing eliminates 2 hours per day for additional savings of $13,000 per year
• Total annual cost savings of $227,370 with an ROI of $188,489 and payback period of 2.47 months.
• Reduced staff by a total of 2 employees and eliminated the need for one digital print shift.
• Fixed and variable costs have been reduced by 21% with these implemented integrations.