CIP4 Announces 2009 CIPPI Award Winners
Implementation Results:
• Bidirectional (JDF/JMF) connection both on “product”-level (ex. administrative data, colors, barcode, time tracking, and approval status) and on “production-job” level (ex. step & repeat and status on plates).
• Breakeven of just four months on the project
“In the current financial year (June 2008 – May 2009), 9 of the 12 months of which have been greatly affected by the current financial crisis, our company turnover has increased. This is not attributable to an increase in our existing customer base, but by our capability to develop new markets thanks to our recognized quality of service. We have now reached a point where nearly all of the information in our MIS system is verified systematically, is reliable and whose quality is enhanced automatically. This integrated information allows us to develop new applications which may be simple at first sight, but very quickly add value to our company and our customers.” – Peter Wack, PDG, 5Sept Etiquette